Additional headboards, support bar, safety rail, and lofting pins required
- Remove the mattress from the bed frame
- Move the bed away from the well if necessary
- Set bed height to low. Lift one side of the bed frame to disengage hooks by applying upward pressure at the corners (If stuck a soft mallet may be used)
- Lower the bed frame to the low position while propping up the headboard with your body
- Align 2 hooks on each side of the bed frame with slots on the headboard channel, insert hooks, and apply downward pressure (headboard will need to be slightly angled to align the slots with the frame hooks)
- Disengage hooks from the other side of the bed and lower bed frame to the low position
- Align hooks to the same height as the other side, insert, and apply downward pressure
- Align two additional headboards across from each other
- Align the support rail at the top-rear slot of the headboard, insert hooks, and apply downward pressure
- Insert lofting pins on each corner of the headboard (4 total)
- Lift headboards with bed frame onto headboards with support rail
- Align lofting pins with headboards and insert pins into the bottom of the headboards
- Place the mattress on the bed frame and push against the wall
- Install safety rail (required for high position)